Contact Us
Wuxi Aosite Stainless Steel Import And Export Co., Ltd.
Tel: +86-510-88156661
Fax: +86-510-83156669
Phone: +86-13395113686 
Email: ray@aositess.com
whatsApp:+86-13395113686
Contact person: ray zhu
ADD: Xishan district Wuxi ,Jiangsu NO21 Shixin road Dongbeitang Street
Home > News > Content
AISI 201 304 316 310S 430 409 Stainless Steel Sheet for Construction
Apr 12, 2018

Basic Info

  • Model NO.: xyf

  • Standard: ASTM, AISI, GB, JIS, DIN, EN

  • Certification: ISO, RoHS, IBR, AISI, ASTM, GB, EN, DIN, JIS

  • Technique: Cold-Drawing

  • Product Name: AISI 201 304 316 310S 430 409 Stainless Steel Shee

  • Deliver Time: 5-7days

  • Trademark: xyf

  • Specification: customized

  • Type: Stainless Steel Sheets

  • Grade: 300 Series

  • Shape: Flat

  • Surface Treatment: Bright

  • Deliver Trems: EXW/Fob/CFR/CIF

  • Surface: No.1/2b/Mirror/4k/8k

  • Transport Package: Standard Seaworthy Package

  • Origin: China

Product Description

AISI 201 304 316 310S 430 409 Stainless Steel Sheet for Construction

TechniqueHot Rolled and Cold Rolled
TypePlate,Coil,Strip
ThicknessHot rolled:0.3mm to 3mm;
Cold rolled:3mm to 120mm
Width1000mm,1500mm,2000mm or customized
Length1000mm to 6000mm or customized
StandardASTM A240, ASTM A167, JIS, SUS, EN, DIN, GB, etc
EdgeMill edge and slit edge
Material Grade201,301,304,304L,316,316L,317,317L,310S,321,
347,409,410,420,630,904,2205,2507
Applicationkitchware, door, decoration, elevator, water tank,etc
MarketMiddle-East Southeast Asia,etc
CertificatesISO9001, MTC is available
MOQ1 Ton per specification
IncotermEXW, FOB, CIF, CFR 
Payment termsPayment≤10,000 USD, 30% T//T in advance,balance T/T before shipment.
Payment≥10,000 USD≤50,000 USD,30% T//T in advance,balance against B/L.
Payment≥50,000 USD,30% T//T in advance, balance against L/C. 
Loading PortShanghai Port
ShippingFCL,LCL,Buck Ship,Express
PackingStandard seaworthy export packing, PE film, wooden pallet
Delivery7 to 10 days for stock,15 to 20 days for production according to order quantity
Capacity500 ton per week





1. Payment: T/T. 30% deposits before production, Balance against the copy of B/L; or L/C at sight,irrevocable.

2. Delivery time: 15 to 20 days after receiving of the deposit

3. Terms of shipment: FOB Shanghai port 

4. Standard seaworthy export packing,PE film,wooden pallet